Iranian Classification Society Rules
Next >
2015
Guidance for
LNG Fuel Ready Ships
GC-18-E
APPLICATION OF
Unless expressly specified otherwise, the requirements in the Guidance apply to LNG Ready Ships for which contracts for construction are signed on or after 1 September 2015.
CHAPTER 1 G
Section 1 G
4. The design and the installation of LNG fuel systems of LNG fuel ready ships are to apply Guidance for Gas-fuelled Ships in force at the time of contract for construction for the new-building. However, where a LNG fuel ready ship in accordance with this Guidance is converted to a gas fuelled ship after delivery, the ship shall comply with Guidance for Gas-fuelled Ships in force at the time of the ship conversion.
Section 2 C lass
CHAPTER R EQUIREMENTS FOR LEVELS
Section 1 G
Section 2 Level of Preparing Generic
Section 3 Level of Installing Parts of
1. The structures below the LNG fuel tanks are to be reinforced in accordance with Ch 3, 102.
1. LNG fuel tanks are to be installed in accordance with
of
of
of
Section 4 S
GUIDANCE FOR LNG FUEL READY SHIPS